Construction & Infrastructure
Batu Giling & Material Kapur untuk Konstruksi

Construction & Infrastructure

Industrial mineral solutions โ€” PT Wira Energi Utama, North Sulawesi

Tested by Sucofindo / Intertek
Export-Ready Logistics (Port Bitung)
Direct Supplier (No Middleman)

Construction & Infrastructure Overview

Indonesia's national infrastructure development program requires large-scale aggregate and construction material supply. Limestone is a versatile material in the construction industry โ€” from road base, crushed stone (1x2 & 2x3), soil stabilization to asphalt filler. PT WEU serves infrastructure projects in Sulawesi, Maluku, and Papua with direct supply from Ratatotok mine via sea routes.

Products Used

Limestone & Crushed Stone

Batu giling 1x2 & 2x3 untuk konstruksi umum, base jalan, dan pengurugan

Fine CaCO3 (Filler)

Filler aspal hotmix, campuran beton, dan mineral filler jalan tol

Hydrated Lime

Stabilisasi tanah subgrade, peningkatan CBR tanah lunak untuk fondasi jalan

Role of Limestone / CaCO3 in Construction & Infrastructure

Limestone serves as structural and functional aggregate in various construction applications. As road sub-base, limestone provides good bearing capacity and drainage. In concrete, limestone aggregate improves workability and reduces water-cement ratio. Fine CaCO3 (asphalt filler) increases mix density and road pavement durability.

Technical Requirements

ParameterValue / Standard
Agregat โ€” Los Angeles Abrasion< 40%
Agregat โ€” Soundness< 10%
Ukuran Agregat Base Course5โ€“40 mm (SNI 1732)
Filler CaCO3 Aspal< 0.075 mm (passing No.200)
CBR Stabilisasi (Kapur)> 10% (7-hari curing)
Kadar Air Agregat< 5%

Process Integration

  1. 1

    Survey & Mix Design

    Analisis gradasi agregat dan desain campuran (AC-WC, AC-BC) sesuai spesifikasi Bina Marga.

  2. 2

    Quarrying & Crushing

    Batu kapur ditambang dan dihancurkan ke gradasi 0โ€“5, 5โ€“10, 10โ€“20, 20โ€“40mm sesuai spesifikasi.

  3. 3

    Quality Testing

    Uji abrasi, berat jenis, penyerapan air, dan gradasi sesuai SNI di lab terakreditasi.

  4. 4

    Pengiriman ke Site

    Pengiriman via dump truck (darat) atau tongkang (pesisir) langsung ke stockpile proyek.

  5. 5

    Aplikasi di Lapangan

    Hamparan, pemadatan, dan pengujian CBR/Marshall sesuai spesifikasi teknis proyek.

Industry Pain Points

Keterlambatan pasokan agregat menghentikan progress pekerjaan dan menyebabkan denda proyek

Agregat tidak memenuhi gradasi SNI menyebabkan mix design aspal tidak optimal dan reject QC

Biaya pengiriman agregat dari Jawa ke Papua/Maluku sangat tinggi โ€” 30โ€“50% dari harga material

Variasi kadar air >5% antara batch menyebabkan penyesuaian mix design berulang dan pemborosan

Optimize Your Construction & Infrastructure Supply Chain

Consult your specific industrial technical and logistics requirements with PT WEU experts for maximum operational efficiency.

Start Industry Consultation โ†’

PT WEU Value Proposition

PT WEU provides limestone aggregate per SNI gradation from 5โ€“40mm with accredited laboratory quality control. North Sulawesi location and Bitung/Kotabunan port access enable rapid delivery to infrastructure projects in Eastern Indonesia at competitive logistics costs.

Production Capability

Crusher Capacity
250 TPH
Monthly Output
150,000 MT
Operations
24/7
IUP OP Area
97.05 Ha

Use Case Simulation

Proyek jalan tol Manadoโ€“Bitung membutuhkan 50.000 MT aggregat sub-base dan 5.000 MT CaCO3 filler aspal. PT WEU memenuhi kebutuhan ini dalam 4 bulan dengan 7 tongkang (7.500 MT/tongkang) untuk sub-base dan pengiriman truk rutin untuk filler. Penghematan logistik vs supplier luar estimasi Rp 8 miliar vs supply dari Jawa.

FAQ

Apakah agregat PT WEU memenuhi spesifikasi Bina Marga untuk jalan nasional?
Ya. Agregat kami telah diuji di laboratorium terakreditasi sesuai SNI dan spesifikasi Bina Marga meliputi abrasi Los Angeles, berat jenis, penyerapan, dan gradasi. COA tersedia per batch pengiriman.
Bisakah PT WEU menyediakan CaCO3 filler untuk campuran aspal hotmix (AC-WC)?
Ya. CaCO3 dengan kehalusan 200โ€“325 mesh sesuai persyaratan mineral filler dalam AC-WC dan SMA. Kadar passing saringan No.200 >85% memenuhi standar AASHTO M17.
Apakah tersedia paket supply yang mencakup agregat dan filler sekaligus?
Ya. Kami menawarkan paket supply terintegrasi โ€” agregat kasar, agregat halus, dan filler CaCO3 dalam satu kontrak pengiriman untuk kemudahan pengelolaan proyek.
Bagaimana dengan ketepatan jadwal pengiriman untuk proyek dengan deadline ketat?
Kami menyediakan jadwal pengiriman mingguan yang terikat kontrak. Dengan kapasitas 250 TPH dan stok penyangga di stockpile, pengiriman digaransi sesuai schedule tanpa risiko stockout.
Apakah tersedia jasa supervisi QC untuk aplikasi stabilisasi tanah dengan kapur padam?
Tim teknis PT WEU dapat memberikan konsultasi teknis dan supervisi aplikasi kapur untuk stabilisasi subgrade, termasuk referensi campuran optimal dan pengujian CBR sebelum dan sesudah stabilisasi.

Ready to Scale Your Construction & Infrastructure Operations?

Our technical team is ready to help you select the right mineral specification for your industrial process.

150K MT

/month capacity

250 TPH

Crusher Plant

Export

Ready Port Bitung