
Coal Power Plant (PLTU)
Industrial mineral solutions โ PT Wira Energi Utama, North Sulawesi
Coal Power Plant (PLTU) Overview
Coal-fired power plants (PLTU) in Indonesia are required to install FGD systems to meet SO2 emission standards. Hydrated lime (Ca(OH)2) is the primary sorbent in dry injection FGD, while limestone is used in wet scrubber systems. PT WEU supplies both products meeting PLTU specifications in Eastern Indonesia.
Products Used
Sorbent utama sistem FGD-DSI untuk absorpsi SO2 dari gas buang batu bara
Sorbent sistem FGD wet scrubber โ dikonversi menjadi slurry CaCO3
Role of Limestone / CaCO3 in Coal Power Plant (PLTU)
In dry sorbent injection (DSI) FGD systems, hydrated lime is injected into flue gas duct before the particulate collector. Ca(OH)2 reacts with SO2 to form CaSO3 captured in bag filters. SO2 removal efficiency reaches 70โ90% depending on stoichiometric ratio. Fineness of 325 mesh (>95% passing) is key to reaction effectiveness.
Technical Requirements
| Parameter | Value / Standard |
|---|---|
| Ca(OH)2 Minimum | > 92% |
| Kehalusan 325 Mesh | > 95% passing |
| Moisture Content | < 1% |
| MgO Maksimum | < 0.5% |
| Reaktivitas pH | pH slurry > 12 |
| Bulk Density | 0.45โ0.55 g/ml |
Process Integration
- 1
Penerimaan Kapur Padam
Diterima dalam jumbo bag 1.000kg atau silo bulk, disimpan di storage kering kedap udara.
- 2
Persiapan Sistem Injeksi
Kapur padam dimasukkan ke pneumatic conveying system menuju injection lance di duct.
- 3
Gas Conditioning
Gas buang dikondisikan ke suhu optimal 135โ150ยฐC untuk reaksi sorbent maksimal.
- 4
Injeksi DSI
Ca(OH)2 diinjeksikan ke gas stream dengan rasio Ca/S = 2โ3 untuk efisiensi removal 70โ90%.
- 5
Penangkapan Reaksi Produk
Partikel CaSO3 dan CaSO4 ditangkap oleh baghouse filter atau ESP.
Industry Pain Points
Regulasi KLHK mensyaratkan emisi SO2 <550 mg/Nm3 โ pelanggas yang tidak comply terancam sanksi besar
Kehalusan kapur padam tidak memenuhi 325 mesh menurunkan efisiensi SO2 removal dan meningkatkan konsumsi sorbent
Keterlambatan pasokan menyebabkan PLTU beroperasi di bawah kapasitas atau menggunakan sorbent darurat berkualitas rendah
Kapur padam dengan moisture >1% menggumpal dalam conveying system dan mengganggu sistem injeksi pneumatik
Optimize Your Coal Power Plant (PLTU) Supply Chain
Consult your specific industrial technical and logistics requirements with PT WEU experts for maximum operational efficiency.
PT WEU Value Proposition
PT WEU's hydrated lime has 94.5% Ca(OH)2, >95% passing 325 mesh fineness, and <1% moisture. With 150,000 MT/month capacity and Sulawesi location, we are the closest supplier for PLTUs in Sulawesi, Maluku, and Papua. Barge delivery from Ratatotok Jetty to coastal PLTU sites takes 3โ14 days.
Production Capability
- Crusher Capacity
- 250 TPH
- Monthly Output
- 150,000 MT
- Operations
- 24/7
- IUP OP Area
- 97.05 Ha
Use Case Simulation
PLTU 200 MW dengan konsumsi sorbent 500 MT/bulan dapat dipenuhi dengan 1 pengiriman jumbo bag/bulan dari PT WEU. COA per batch membuktikan kehalusan 325 mesh dan Ca(OH)2 >92% untuk audit KLHK. Jadwal pengiriman bulanan tetap memastikan stok sorbent minimal 30 hari.
FAQ
Berapa rasio stoikiometri Ca/S yang direkomendasikan?
Apakah tersedia analisis reaktivitas untuk sistem FGD kami?
Bagaimana pengemasan yang tepat untuk menghindari penggumpalan?
Apakah PT WEU dapat menyediakan technical support untuk commissioning FGD?
Related Industrial Exploration
Core Products
Logistics & Export
Business Support
Ready to Scale Your Coal Power Plant (PLTU) Operations?
Our technical team is ready to help you select the right mineral specification for your industrial process.
150K MT
/month capacity
250 TPH
Crusher Plant
Export
Ready Port Bitung