Coal Power Plant (PLTU) Overview

Coal-fired power plants (PLTU) in Indonesia are required to install FGD systems to meet SO2 emission standards. Hydrated lime (Ca(OH)2) is the primary sorbent in dry injection FGD, while limestone is used in wet scrubber systems. PT WEU supplies both products meeting PLTU specifications in Eastern Indonesia.

Products Used

Hydrated Lime

Sorbent utama sistem FGD-DSI untuk absorpsi SO2 dari gas buang batu bara

Limestone

Sorbent sistem FGD wet scrubber โ€” dikonversi menjadi slurry CaCO3

Role of Limestone / CaCO3 in Coal Power Plant (PLTU)

In dry sorbent injection (DSI) FGD systems, hydrated lime is injected into flue gas duct before the particulate collector. Ca(OH)2 reacts with SO2 to form CaSO3 captured in bag filters. SO2 removal efficiency reaches 70โ€“90% depending on stoichiometric ratio. Fineness of 325 mesh (>95% passing) is key to reaction effectiveness.

Technical Requirements

ParameterValue / Standard
Ca(OH)2 Minimum> 92%
Kehalusan 325 Mesh> 95% passing
Moisture Content< 1%
MgO Maksimum< 0.5%
Reaktivitas pHpH slurry > 12
Bulk Density0.45โ€“0.55 g/ml

Process Integration

  1. 1

    Penerimaan Kapur Padam

    Diterima dalam jumbo bag 1.000kg atau silo bulk, disimpan di storage kering kedap udara.

  2. 2

    Persiapan Sistem Injeksi

    Kapur padam dimasukkan ke pneumatic conveying system menuju injection lance di duct.

  3. 3

    Gas Conditioning

    Gas buang dikondisikan ke suhu optimal 135โ€“150ยฐC untuk reaksi sorbent maksimal.

  4. 4

    Injeksi DSI

    Ca(OH)2 diinjeksikan ke gas stream dengan rasio Ca/S = 2โ€“3 untuk efisiensi removal 70โ€“90%.

  5. 5

    Penangkapan Reaksi Produk

    Partikel CaSO3 dan CaSO4 ditangkap oleh baghouse filter atau ESP.

Industry Pain Points

Regulasi KLHK mensyaratkan emisi SO2 <550 mg/Nm3 โ€” pelanggas yang tidak comply terancam sanksi besar

Kehalusan kapur padam tidak memenuhi 325 mesh menurunkan efisiensi SO2 removal dan meningkatkan konsumsi sorbent

Keterlambatan pasokan menyebabkan PLTU beroperasi di bawah kapasitas atau menggunakan sorbent darurat berkualitas rendah

Kapur padam dengan moisture >1% menggumpal dalam conveying system dan mengganggu sistem injeksi pneumatik

Optimize Your Coal Power Plant (PLTU) Supply Chain

Consult your specific industrial technical and logistics requirements with PT WEU experts for maximum operational efficiency.

Start Industry Consultation โ†’

PT WEU Value Proposition

PT WEU's hydrated lime has 94.5% Ca(OH)2, >95% passing 325 mesh fineness, and <1% moisture. With 150,000 MT/month capacity and Sulawesi location, we are the closest supplier for PLTUs in Sulawesi, Maluku, and Papua. Barge delivery from Ratatotok Jetty to coastal PLTU sites takes 3โ€“14 days.

Production Capability

Crusher Capacity
250 TPH
Monthly Output
150,000 MT
Operations
24/7
IUP OP Area
97.05 Ha

Use Case Simulation

PLTU 200 MW dengan konsumsi sorbent 500 MT/bulan dapat dipenuhi dengan 1 pengiriman jumbo bag/bulan dari PT WEU. COA per batch membuktikan kehalusan 325 mesh dan Ca(OH)2 >92% untuk audit KLHK. Jadwal pengiriman bulanan tetap memastikan stok sorbent minimal 30 hari.

FAQ

Berapa rasio stoikiometri Ca/S yang direkomendasikan?
Untuk target removal SO2 >80%, rasio Ca/S = 2.0โ€“2.5 umumnya efektif menggunakan produk kami dengan Ca(OH)2 94.5%. Konsultasikan dengan tim teknis kami untuk optimasi spesifik sistem Anda.
Apakah tersedia analisis reaktivitas untuk sistem FGD kami?
Ya. Kami menyediakan data reaktivitas pH dan surface area analysis yang diperlukan untuk verifikasi performa dalam sistem FGD spesifik Anda.
Bagaimana pengemasan yang tepat untuk menghindari penggumpalan?
Produk dikemas dalam jumbo bag liner PE berlapis dengan valve seal. Untuk storage >30 hari, disarankan silo tertutup dengan sistem deaeration untuk menjaga fluiditas powder.
Apakah PT WEU dapat menyediakan technical support untuk commissioning FGD?
Tim teknis kami dapat hadir untuk supervisi commissioning dan optimasi sistem injeksi untuk memastikan efisiensi SO2 removal sesuai target compliance KLHK.

Ready to Scale Your Coal Power Plant (PLTU) Operations?

Our technical team is ready to help you select the right mineral specification for your industrial process.

150K MT

/month capacity

250 TPH

Crusher Plant

Export

Ready Port Bitung